rotex a1

Rotex a1

S a f e t y I n s t ru c t i o n s a n d S t a t e m e n t o f Wa rra n t y When working on the heating system, make sure that the main switch is in the off position at all times and secured against accidental switching on. Only authorised and properly trained rotex a1 heating specialists may perform rotex a1 on the heating system. The minimum distances to walls and other objects, stated in chapter 1, rotex a1, must be observed unconditionally.

Print on Demand. Reprinted in 0 with the help of original edition published long back. As these are old books, we processed each page manually and make them readable but in some cases some pages which are blur or missing or black spots. It is an eBook edition of the original edition published long back. We found this book important for the readers who want to know more about our old treasure so we brought back in ebook pdf format. These are scanned images of the original book in pdf format.

Rotex a1

.

If the outdoor temperature sinks below the anti-frost limit, the unit switches to low operation automatically. Used to choose the set temperature for low operation night lowering. Every subsequent time the blue button is pressed, the value of the selected parameter is rotex a1.

.

Table Of Contents. Table of Contents. Quick Links Download this manual. For the operator. Previous Page. Next Page.

Rotex a1

Hide thumbs. Table Of Contents. Table of Contents. Quick Links Download this manual. For certified companies. Previous Page. Next Page. Our war- ranty conditions beyond that can be found online on your sales representative's webpage. Page 4: Safety Safety Safety 2. Please read this manual carefully and thoroughly before pro- Electric power ceeding with the installation or modification of the heating system.

Cooker gap cover

The gas data on the boiler label of the mechanism should be compared with connection data provided by your gas supply firm. The first is called Sanicube, a large hygienic tank made entirely out of synthetic material. The flue gas must be released in the following manner: - by way of chimneys in compliance with DIN - by way of vertical flue gas lines with general building authorization of air waste gas systems - by way of free standing chimneys see DIN and DIN - by way of exhaust shafts meeting the general requirements of flue gas mechanisms, in compliance with DIN part 1 see section 6. Download now. The programmes set at the factory are shown below. Remark: The discharge height of the discharge pipe should not lie above the lower edge of the waste gas pipe. Removing the Insulation Mould Parts The insulation mould parts are fixed to the burner with twelve open mouthed connecting blocks. The following appears on the display:. After a successful test, the STL must be unlocked manually after the boiler cools down fig. S a f e t y I n s t ru c t i o n s a n d S t a t e m e n t o f Wa rra n t y When working on the heating system, make sure that the main switch is in the off position at all times and secured against accidental switching on. Parameter to base value blue button Indication range: - h Blue button 5 sec. If faults occur in the power supply, an authorised company approved by your energy provider should be contracted with the removal of the fault. If you install the unit with a private reservoir, plan for a boiler platform with a height of at least 80 mm. The processing of hot water occurs during the operation times fixed by time programme 2. Manual Operation for specialists or in case of defects in the electrical control system.

Rotex has been setting and shattering standards for industrial separation equipment since Rotex Global patented the innovative concept of Gyratory Reciprocating Motion and perfected it over years of lab testing, custom installations and field experience.

ROTEX assumes responsibility for faults in materials and fabrication when the product is used in accordance with these warranty conditions. Open the service lid and press the blue button while turning on the main switch. Before connecting to the power-supply line, compare the main voltage V 50 Hz , stated on the type label, with the voltage of the supply line. Every A1 BG inline oil burner is equipped for the installation of a mixer for an additional mixer circuit. Firing Device pos. Skip carousel. S a f e t y I n s t ru c t i o n s a n d S t a t e m e n t o f Wa rra n t y When working on the heating system, make sure that the main switch is in the off position at all times and secured against accidental switching on. The heating specialist mode includes 14 pre-programmed parameters as well as a reset, an operating hour counter, a burner start counter, and a hot water mode. The blow-off output must correspond to the rated heating output of the A1. The flue gas must be released in the following manner: - by way of chimneys in compliance with DIN - by way of vertical flue gas lines with general building authorization of air waste gas systems - by way of free standing chimneys see DIN and DIN - by way of exhaust shafts meeting the general requirements of flue gas mechanisms, in compliance with DIN part 1 see section 6. The inner pipe carries flue gas out while the outer annular gap sucks combustion air in from outside.

1 thoughts on “Rotex a1

Leave a Reply

Your email address will not be published. Required fields are marked *